How much do building consents cost NZ?
A minimum fee of $500.00 and maximum of $22,000.00 applies to each item where rates are calculated by square metre of the floor area. 4. Any building consent with a construction value of over $3,000,000.00 will be calculated as: Construction Value x 0.8% + Government Levies.
What is the process for obtaining a building consent?
Building consent process 10-step guide
- Step 1 – Prepare your building consent application.
- Step 2 – Apply for a building consent.
- Step 3 – Project Information Memorandum (PIM)
- Step 4 – Development contributions.
- Step 5 – Processing your application.
- Step 6 – The outcome of you application.
Can you build a sleepout without consent?
In August 2020, Auckland Council announced exemptions to the Building Act. The changes allow homeowners to build a sleepout, a carport or a shed without going through the council.
How long does it take to get building consent in Auckland?
20 working days
The building consent process We have 20 working days to process your building consent application. The building consent process involves trained professionals in a range of building disciplines including architecture, engineering, construction and plumbing.
Do you have to pay for building consent?
Deposit amounts you will need to pay You must include the relevant lodgment deposit with your building or resource consent application to cover initial application processing costs. If the actual cost is less than the deposit amount, we will refund the difference.
How long does it take to get a building consent in Auckland?
What documents are required for a building consent?
Building Consent Documentation
- Proof of ownership. The ‘proof of ownership’ must be current – that is, less than three months old.
- Architectural Plans.
- Architectural Specification.
- Structural Plans.
- Structural Specifications.
- Fire reports.
- Accessibility reports.
- MEP Plans.
How much does it cost to get building consent?
Building applications
Description | Processing deposit (portion of deposit charged for processing) | Total |
---|---|---|
Project value $1,000,000 and over | $7200 | $10170 |
Project value $5,000 to $19,999 | $1200 | $1896 |
Project value $20,000 to $99,999 | $2000 | $2870 |
Project value $100,000 to $499,999 | $3200 | $4982 |
Can you sell a house without code of Compliance?
Owning a property without any required code compliance certificate may affect the property value and your ability to sell the property. It may also affect your ability to insure the property and borrow money against the property, depending on the extent of work done.
How long does a building consent take Auckland?
Who is responsible for obtaining a building consent?
Whose responsibility is it to get a building consent? Although it is primarily the responsibility of the owner(s) to apply for a building consent before the building works begin (section 44 of the BA), the BA clarifies that no person may carry out building work except in accordance with a building consent.
What size building can you build without a permit NZ?
30 square metres
Buildings with a maximum floor area of 30 square metres can be built by a non-professional, where only lightweight materials with structural components built in accordance to Building Code compliance B1/AS1 are used.
Do I need a building consent for a sleepout in NZ?
Current building consent exemptions already allow for a sleepout up to 10 square metres to be built without a building consent, but the new exemptions expand this all the way up to 30 square metres if the work is carried out of supervised by an LBP.
What can you build without a permit in NZ?
Building projects that are now exempt from needing a permit are:
- Single storey, detached buildings up to 30m2.
- Carports with a maximum floor area of 40m2.
- Awnings, verandahs and porches with a maximum size of 30m2.
- Detached single storey pole sheds and hay barns.
Do you need two doors between toilet and kitchen NZ?
At least one door needs to be provided between the toilet and kitchen, according to the Building Code, said a spokeswoman for the Ministry of Business, Innovation and Employment. The Residential Tenancies Act also states that the landlord must comply with all building and health and safety requirements.
How much does it cost to get a resource consent Auckland?
Currently the deposit fee charged by Auckland Council for a basic land-use application involving residential activity is $3,000. The deposit fee for non-residential activities is $5,000 and for a basic subdivision is$4,500.
Can a building be occupied without an occupation certificate?
Without a valid OC, your occupancy is illegal as it can be classified as an unauthorised structure by the authorities. 2. OC is crucial while applying for a home loan or loan to purchase a resale flat. You cannot even sell your property without a valid OC in hand.
How do I apply for a new building consent?
You can apply for a new building consent online. The information in this section relates to how to get a building consent, and related certificates and approvals. You may also need a resource consent to proceed with your building work. There is a link to the resource consent section at the bottom of the page.
How long does it take to assess my building consent application?
It can take us up to 20 working days to assess your building consent application. Your allocated service manager will contact you if we need more information – see How we assess your building consent application . If you have lodged your consent online, you can access and track:
Do I need a resource consent for my building work?
You may also need a resource consent to proceed with your building work. There is a link to the resource consent section at the bottom of the page. We recommend seeking independent advice on building consent applications and whether you may also need a resource consent. Breaking down the building consent process into 10 steps.
How do I appeal a building consent decision?
If you want to appeal a building consent decision, you can apply for a determination through the Ministry of Business, Innovation and Employment (MBIE). Buildings built from modular components, such as shipping containers, are an increasingly popular option for commercial and residential use.